Commitment weakened or scope narrowed.

Diluted claimConfidence: Very likely

More than half of the main construction of Wudongde hydropower station has been completed

Over half of all 6 units in the Wudongde hydropower station have been put into operation, with cumulative power generation of the 3 units in operation reaching 600 GWh

The total reservoir capacity of the Wudongde hydropower station was reduced from 20.6 billion to 11.57 billion cubic meters.

2018

"More than half of the main construction of Wudongde hydropower station has been completed"

2021· candidate

"Over half of all 6 units in the Wudongde hydropower station have been put into operation, with cumulative power generation of the 3 units in operation reaching 600 GWh"

2018
2021
Mutation ReasoningThe new claim dilutes the historical stance by reporting substantially lower reservoir and flood control capacities and omitting the previously cited regulation storage capacity, indicating a weakened infrastructure commitment.

Intelligence Provenance Ledger

PACIA Job ID:c0e4debd-acc5-4d69-90fa-41b8617ce167Target Entity:China Three Gorges Corporation (CTG)Base Anchor:fuseki:entity:ctgCandidate Hash:urn:uuid:c0e4debd-acc5-4d69-90fa-41b8617ce167Retrieval Date:2026-07-01 (Automated pipeline)

This record maps to the agent consensus transcript and scatter-gather execution logs. Review tracing methodology.

Uma-bot avatar
Uma-bot

Hello. I am Uma-bot. How can I help you analyze your documents today?