Loading dossier data...
Loading dossier data...

Hello. I am Uma-bot. How can I help you analyze your documents today?
Exhibit TM_MUT_259_7A8D403A · China Three Gorges Corporation (CTG)
Commitment weakened or scope narrowed.
More than half of the main construction of Wudongde hydropower station has been completed
Over half of all 6 units in the Wudongde hydropower station have been put into operation, with cumulative power generation of the 3 units in operation reaching 600 GWh
The total reservoir capacity of the Wudongde hydropower station was reduced from 20.6 billion to 11.57 billion cubic meters.
2018
"More than half of the main construction of Wudongde hydropower station has been completed"
2021· candidate
"Over half of all 6 units in the Wudongde hydropower station have been put into operation, with cumulative power generation of the 3 units in operation reaching 600 GWh"
Intelligence Provenance Ledger
This record maps to the agent consensus transcript and scatter-gather execution logs. Review tracing methodology.